“TWR Research-Steam Turbine”的版本间的差异

来自TeamMoeg官方WIKI
跳到导航 跳到搜索
[已复核版本][已复核版本]
第1行: 第1行:
<!-- Auto generated in 1670359800629 -->Required Points: 8000IOPS
<!-- Auto generated, do not edit -->Required Points: 8000IOPS
== Category ==
== Category ==
[[TWR_Research#Production|Production]]
[[TWR_Research#Production|Production]]

2022年12月7日 (三) 13:28的版本

Required Points: 8000IOPS

Category

Production

Dependencies

Clues

Finish paper

30% Required

Effects

New Building

Industrial Steam Turbine

Research Description

Before Completion

If I combine stress device and electricity generation deivice, I can save the loss from transmission. Meanwhile, because the stress device is within the electric generation device, I can use a better structure to greatly reduce power consumption while producing higher voltage. But the steam boilers are anyway finite sources. New stress machines or larger boilers are urgently needed to consider.

After Completion

Transforming rotational energy to electric energy can convert energy that are not possible to store into energy that can be stored. But, a severe problem is, the current efficiency is too low. If I can increase the efficiency I can reduce my reliance on fuel.